GCE GROUP ANNOUNCES REBRANDING FIND OUT MORE close
Home » GAS MANIFOLD MC80 - STABILIZER

GAS MANIFOLD MC80 - STABILIZER

Group Number: 3611

Whole medical range is available on

Manifold MC80 – STABILIZER is a second stage pressure reduction unit with the task to equalize the eventual pressure variation in the hospital pipeline system to ensure a correct pressure from the terminal units. MC80 – STABILIZER is only second stage reduction unit where the primary gas supply is provided by high pressure gas manifolds (such as MC80, MM90 or liquid oxygen tank (LOX)). When there is a signal for pressure deviation in relation to the alarm settings, the alarm can easily be displayed on a Gas alarm unit. It is also possible to send information to the central operation control. The stabilizer can be delivered with either pressure transmitter 4–20 mA or with contact gauge.
Gas reduction unit MC80 – STABILIZER must always be installed in compliance with the standards EN ISO 7396-1 and the appropriate national standards.

SPECIFICATION

MC80 STABILIZER INCLUDES FOLLOWING COMPONENTS:

  • MC80 Stabilizer Manifold

FOR A COMPLETE MC80 STABILIZER MANIFOLD ADD:

  • Alarm unit (included if ordered together with HP unit)
  • Ball valve DN15 with welding adaptors
Item No.  Denomination Gas
PRV
Alarm
0727324 MC80 STAB O2 With pull-ring 4–20 mV
0727325 MC80 STAB Air With pull-ring 4–20 mV
0727326 MC80 STAB N2O,CO2 With pull-ring 4–20 mV
0727339 MC80 STAB ALL With pull-ring Contact gauge
0727340 MC80 STAB ALL With pull-ring 4-20 mA

735100001554 MC80 Stabilizer leaflet EN

TECHNICAL DATA

Gases: O2, Air, N2, N2O, CO2, (all medical gases)
Nominal flow: 200 m3/h
Inlet maximal pressure: 20 bar (2000 kPa)
Outlet nominal pressure: 4,5 bar (setting range 0,5–6 bar)
Inlet connection: G3/4"F
Outlet connection: G3/4"F
Pressure relieve valve: 6,8 bar
Pressure relieve valve
pipe dimension:

∅ 15 mm

Regulatory status:

Complies with Medical Devices Directive 93/42/EEC

Complies with EN ISO 7396-1
(Central Gas Supply Systems)

Complies with EN 60601-1-2
(Electromagnetic compatibility)

present SIS HB 370 and HTM 02-01

 

Technical Datasheets Top

Download Technical Datasheets

Technical Drawings Top

Download Technical Drawings